Date of completion

Description and scope of delivery

Customer

February 2012

Basic engineering, detail engineering, project documentation, production, delivery and assembly of a boiler for a new source of combined heat and power generation by biomass combustion with the capacity of 30 t/h, 445ºC, 3.8 MPa, 7 MWe in Rakytovce Waste Water Treatment Plant, Banská Bystrica, Slovak Republic

Investspol, s.r.o.
Slovak Republic

March 2008

Basic engineering, detail engineering, project documentation, production, delivery and assembly of a fluidized bed boiler for a source of combined heat and power generation in Malsch by biomass combustion with the capacity of 16t/h, 485ºC, 6.2 MPa

BMK Biomasse Kraftwerk, GmbH.,
Germany

March 2007

Basic engineering, detail engineering, project documentation, production, delivery and assembly for a new source of combined heat and power generation by biomass combustion with the capacity of 30 t/h, 430ºC, 6.3 MPa, 6.4 MWe in Smrečina Hofatex, a.s. Banska Bystrica, Slovak Republic

Smrečina Hofatex, a.s
Slovak Republic

September 2006

Documentation for building permit for a cogeneration unit for biomass combustion of 2.5 MWe

Town of Ľubica

July 2005

Detail engineering of reconstruction of combustion chamber and EKO boiler for biomass combustion with the capacity of 24 t/h, 4 MPa, 425 °C in Wilburgstetten, Germany

Rettenmeier Holding AG,
Germany

 