Date of completion

Subject-matter

Customer

Under implementation

Detail engineering of recovery boiler for combustion of  sodium hydroxide and natural gas for Lenzing, Austria, 31 t/h, 7.9 MPa, 480°C

RAFAKO, S.A.

Under implementation

Detail engineering of recovery boiler for combustion of  black liquor from cellulose production process, of fumes from production of cellulose and natural gas for Lenzing, Austria, 145 t/h, 8.4 MPa, 485°C

RAFAKO, S.A.

January 2011

Procuration, coordination and control of construction of power plant of the peak source 58 MWe PPC Bratislava

PPC Energy, a.s.

March 2010

Detail engineering of boiler for municipal waste combustion for “Waste to Energy Plant”, Bern, Switzerland, 70 t/h, 4 MPa, 400°C

MARTIN, GmbH

November 2009

Documentation for territorial decision for the peak source of 58 MWe Prostějov

Moravia Energo, a.s.

January 2009

Documentation for territorial decision, building permit and implementation of the peak source 58 MWe PPC Bratislava

PPC Energy, a.s.

April 2008

Feasibility study of construction of the peak source 58 MWe Brno.

JET Power, a.s.

January 2008 Detail engineering of recovery boiler for combustion of sodium hydroxide and natural gas for Lenzing, Austria, 31 t/h, 7.9 MPa, 480°C SES Tlmače, a.s.
July 2007 Feasibility study of construction of the peak source 58 MWe PPC Bratislava PPC Energy, a.s.
September 2006 Documentation for building permit of cogeneration unit for biomass combustion 2.5 MWe Obec Ľubica
November 2005 Feasibility study of construction of steam-gas cycle at compressor stations in Veľké Kapušany SPP, a.s. Bratislava
July 2005 Detail engineering of reconstruction of combustion chamber and EKO boiler for biomass combustion with the capacity ot 24 t/h, 4 MPa, 425 °C in Wilburgstetten, Germany Rettenmeier Holding AG, Nemecko
December 2004 Interconnecting piping of new recovery boiler and cellulose factory. NEUSIEDLER SCP, a.s. Ružomberok

January 2003

Study for reconstruction of boiler K4 with the capacity of 120 t/s with a possibility to increase the output to 150 t/h

Kappa Štúrovo, a.s

News

Peak source No. 1 for Prostějov

Peak source No. 1 for Prostějov

The mechanical erection of the gas turbine was completed at the construction of the peak source No. 1 for Prostějov.

16. May 2012